|
Home | Site Map |
|
|
| |
|
American D-Day Virtual Museum
|
|
|
D-Day on Omaha Beach
01 - 02 - 03 - 04 - 05 - 06 - 07 - 08 - 09 - 10 - 11 - 12 - 13 - 14 - 15
|
|
|
II - c - The advance from Easy Red on Omaha BeachElements of three companies shared in the assault on the bluffs between E-1 and E-3 draws.At this part of Easy Red, the beach shelf above the shingle embankment is more than a hundred yards wide, with areas of swamp along the inland edge of the flat. One hundred and thirty feet high on this sector, the bluff is reached by 200 yards of moderate slope, patched with heavy bush. Five hundred yards west of E-3, a small draw led up at a slight angle to the west, forming a possible corridor for advance to the bluff crest. Below the draw on the flat was a ruined house. The 1st Section of Company E, 16th Infantry, and two of the scattered sections of E, 116th, had come to shore here in the first wave. The 16th's unit, led by 2nd Lieutenant John M. Spalding, blew a gap in the wire above the shingle, made its way past the house, and then was held up by minefields in the marshy ground at the foot of the slopes. Intense small-arms fire came from an emplacement to the left, in the E-3 strongpoint. Spalding's men found a way past the mines and were beginning to work up the slope, using the defilade afforded by the small draw. To the west, and out of contact, the two sections from the 116th had cut the wire and dashed across the flat, but mines stopped them near the start of the hillside and they took shelter in a ditch. A soldier who went ahead to clear a path by use of a bangalore was killed by an antipersonnel mine. Meanwhile Company G of the 16th RCT had landed (0700) and had reached the embankment in good order. The company's machine guns, set up behind the shingle, found no targets until LCVP's of the 1st Battalion, coming toward the beach (about 0730), drew enemy fire from 8 or 10 small emplacements along the half mile of bluff. While the heavy weapons built up a volume of supporting fire, a few men from each section blew gaps in the extensive double-apron and concertina wire beyond the shingle. Their work was made more difficult by anti-personnel mines set to detonate by trip wires. Four bangalores were required to cut one lane. Engineers of Company A, 1st Engineer Combat Battalion and Company C, 37th Engineer Combat Battalion helped in gapping and marking the lanes. When G's men reached the slopes they came in contact with Lieutenant Spalding's section of E and the two sections of the 116th. In an effort to coordinate the advance, an arrangement was made with these units to operate on Company G's right. The mined areas, in which a part of the mines were faked, slowed up every unit that crossed the beach, then and for some time. Company G found one route through the mines by going over the dead bodies of two soldiers who had been caught there earlier. While the company was making its way across the flat, bothered more by the minefields than enemy fire, Captain Joseph T. Dawson and one man went on ahead. When they were halfway up the hill, an enemy machine gun at the head of the small draw forced Dawson into cover. He sent his companion back to bring up the company and crawled on from one patch of brush to another. By the time he was 75 yards from the gun, the enemy lost sight of him. Circling to his left, he came to the military crest a little beyond the machine gun, and got within 30 feet before the Germans spotted him and swung their weapon around. Dawson threw a fragmentation grenade which killed the crew. This action opened the way up the little draw, but it took some time to get the company up as a result of disorganization suffered in crossing the beach flat. The 5th Section, first to arrive, knocked out two more machine guns and took a prisoner. On the whole, enemy opposition had not been heavy, and cover on the slopes allowed Company G to make the crest with few casualties. Their movement forward, from embankment to the bluff top, had taken place between 0730 and 0830. Enemy fire died away as the troops emerged on the fields of the upland, reorganized, and started south in column of sections. Their principal concern was with the frequent indications of mined areas just beyond the bluff top. To their right Lieutenant Spalding's section of Company E, 16th RCT, was getting up about the same time, helped by covering fire from Company G, and effecting a useful extension of the front of penetration. The section now numbered 3 men, having lost 3 at the beach and 3 more getting past an enemy machine gun on the bluff side. The gun was operated by a lone soldier who was captured and found to be Polish. He informed Spalding that there were 16 enemy in trenches to his rear. The Company E section got to the trenches, sprayed them with fire and found the Germans had withdrawn. Spalding turned west along the bluff crest, losing contact with Company G as that unit headed south. Moving through hedgerowed fields and wooded areas, the Company E group came up on the rear of the strongpoint guarding E-1 draw. The Germans were manning trenches overlooking the beach, and attack from the high ground caught them by surprise. In two hours of confused fighting, Spalding's men got through the outworks of this strongpoint and overcame opposition by close-in work with grenades and rifles Naval fire hitting in the parts of the strong-point below the bluff top, helped to demoralize the resistance. Twenty-one prisoners were taken, and several enemy killed, without loss to the attackers. Although the fortified area was too extensive to be thoroughly cleaned out by Spalding's small force, the strongpoint east of E-1 had been effectively neutralized by midmorning, just when important reinforcements for the assault were beginning to land in front of the draw. About 1100 Spalding's section was joined by some other elements of Company E, which had come up from further east. They brought word from battalion to head south for Colleville. The area opened up by Company G became a funnel for movement off the beach during the rest of the morning. The command group of the 16th RCT had landed in two sections; the first, coming in at 0720, lost the executive officer and 35 men on the tidal flat. Colonel George A. Taylor arrived in the second section at 0815 and found plenty to do on the beach. Men were still hugging the embankment, disorganized, and suffering casualties from mortar and artillery fire. Colonel Taylor summed up the situation in terse phrase: "Two kinds of people are staying on this beach, the dead and those who are going to die-now let's et the hell out of here." Small groups of men were collected without regard to units, put under charge of the nearest noncommissioned officer, and sent on through the wire and across the flat, while engineers worked hard to widen gaps in the wire and to mark lanes through the minefields. Confusion prevailed all the way along the route to the bluff top, with enough scattered enemy fire from the flanks and mortar fire falling on the bluff slope to cause more delay and to give late-comers the impression that they were leading the assault. A traffic jam threatened to clog the trail through the little draw, as leaderless groups stopped to rest just below the shelter of the crest; one such group was picked up by an engineer platoon going inland as a security patrol and went on with them. Colonel Taylor's command post was set up just below the bluff crest, and regimental and battalion officers concentrated on getting men forward. Despite all difficulties, troops were brought up from both flanks of the penetration area and sent inland. During the morning a few scattered sections of Companies E, F, and H moved laterally along the beach from the east and took Company G's route; the 1st Battalion, 16th RCT, came over from the west. The 1st BLT of the 16th landed between 0730-0800, with Company A just east of E-1, and B and C near the area where 2d BLT troops were then starting up the bluff. Company A moved across the flat and had serious difficulties after passing the antitank ditch below the E-1 strongpoint; mines and small-arms fire inflicted 48 casualties, including 3 officers. Reaching the bluff slope, Company A found more mines and to avoid them took a path that led eastward along the lower slope. Movement was slow, as the men went along the path in single file and had to cross areas exposed to enemy fire, and further difficulty was caused by meeting a party of 116th men going in the opposite direction. The other units of the 1st BLT got to the bluff crest about 0930, in the area where Company G had already passed inland. [Omaha Beachhead (6 June-13 June 1944) - American Forces in Action Series - Historical Division - War Department - 20 September 1945]
Never Forget American D-Day is still actively collecting testimonies, objects and documents from all D-Day veterans or families. If you have a potential donation or questions, please contact the association historian, laurentlefebvre@americandday.org |
|
|
Home - D-day beaches today - D-day virtual musem - American cemetery - D-day ceremonies - D-day books - D-day shop - D-day links - Guestbook
Copyright (c) 2002 American D-Day
|
|